WEBVTT
Kind: captions
Language: en

00:00:00.250 --> 00:00:16.900
Yes, dear participants. Welcome to Lecture
33 of Micro Irrigation Engineering subject.

00:00:16.900 --> 00:00:29.240
Lecture 33 is 
on maintenance of drip irrigation system.

00:00:29.240 --> 00:00:44.450
In previous Lecture 32, we learned about installation
and operation of drip irrigation system. The

00:00:44.450 --> 00:00:54.559
installation, we discussed how each unit should
be properly connected and one should take

00:00:54.559 --> 00:01:03.110
care how to operate the system. Now, once
the system is in operation for some time,

00:01:03.110 --> 00:01:11.659
it needs regular maintenance, routine checking
so that we can get full efficiency of the

00:01:11.659 --> 00:01:23.170
system. And mainly, it is important in case
of drip irrigation system that all the drippers

00:01:23.170 --> 00:01:35.040
they give highest emission uniformity. And
this is only possible when we are keeping

00:01:35.040 --> 00:01:42.890
full care and full maintenance of all the
components of drip irrigation system.

00:01:42.890 --> 00:01:52.420
So, in this particular Lecture 33, we will
discuss about maintenance of filtration system,

00:01:52.420 --> 00:02:03.610
maintenance of main pipe, sub-main pipe, maintenance
of lateral pipe and drip emitters. So, let

00:02:03.610 --> 00:02:16.950
us go in deeper part of the particular topic.
So, maintenance requires periodic preventive

00:02:16.950 --> 00:02:30.910
checking of the system for successful operation
of micro irrigation system. Functioning of

00:02:30.910 --> 00:02:42.090
drip emitter, how does it wet, leakage from
the pipeline, valves, fittings? It should

00:02:42.090 --> 00:02:52.840
be checked regularly. If we are applying water
say in a previous day and then next day morning

00:02:52.840 --> 00:02:56.950
when you go you see how the wetting it has
been formed.

00:02:56.950 --> 00:03:08.739
If it is in a proper uniform circle all throughout
the drip lateral you observe then you can

00:03:08.739 --> 00:03:17.310
know that whether all the drip emitters they
have given uniform discharge. If some circles

00:03:17.310 --> 00:03:25.069
these are smaller in size some circle these
are in larger in size, it means the drippers

00:03:25.069 --> 00:03:36.230
are not delivering uniform discharge. So,
another part is placement of dripper. Sometime

00:03:36.230 --> 00:03:43.160
what happened while working, while intercultural
operation, while putting the mulch. It may

00:03:43.160 --> 00:03:52.720
get disturbed. So, it should be properly placed
at appropriate location near the plant root

00:03:52.720 --> 00:03:53.720
zone.

00:03:53.720 --> 00:04:03.069
This is mainly in surface drip irrigation
system. Leakage through filter, gasket, lids,

00:04:03.069 --> 00:04:13.709
flushing valve, these are as well as you know
there are several other connectors and fittings.

00:04:13.709 --> 00:04:19.739
This should be monitored regularly.

00:04:19.739 --> 00:04:29.440
Filter cleaning, we know as the name says
filter means removal of undesired soluble

00:04:29.440 --> 00:04:38.630
material in the filter system in the drip
irrigation system. So, filter is the heart

00:04:38.630 --> 00:04:47.660
of the drip system and its failure is non-functioning.
They are partial functioning, will lead to

00:04:47.660 --> 00:04:56.360
clogging of the system. So, pressure differential
across the filter is to be checked regularly.

00:04:56.360 --> 00:05:08.180
This will give us the idea that how the filter
is effectively working. So, we can accordingly

00:05:08.180 --> 00:05:11.080
set the timings.

00:05:11.080 --> 00:05:18.440
Hydro cyclone filter is one of the types of
filter. And this should be installed before

00:05:18.440 --> 00:05:26.930
sand and screen filter. So, hydro cyclone
filter requires relatively as compared to

00:05:26.930 --> 00:05:34.990
other filters it requires relatively less
maintenance. For cleaning the dirt inside

00:05:34.990 --> 00:05:49.300
the underflow chamber, we need to open the
back flushing valve daily. This is just a

00:05:49.300 --> 00:05:58.420
few minutes work. And then flush the chamber
by opening the flush valve or cap thoroughly.

00:05:58.420 --> 00:06:05.979
Sand filter, it should be backwashed daily
for 5 minutes to remove all the silt and other

00:06:05.979 --> 00:06:18.500
dirt material which is accumulated on previous
day irrigation. Once in a week, while backwashing,

00:06:18.500 --> 00:06:27.039
backwash water should be allowed to pass through
the lid instead of backwash valves. So, sand

00:06:27.039 --> 00:06:35.419
in the filter bed is stirred up to the filter
candles without damaging them. Otherwise,

00:06:35.419 --> 00:06:43.870
the grading of one particular grade of the
sand, if it is misplaced, it will not work

00:06:43.870 --> 00:06:45.919
effectively.

00:06:45.919 --> 00:06:53.970
Dirt accumulated deep inside the sand bed
should be allowed to go with the water through

00:06:53.970 --> 00:07:07.650
the lid. There is a need to use backwashing.
And the pressure drop between the inlet end

00:07:07.650 --> 00:07:19.479
of the filter and at the exit end of the filter.
If it exceeds 70 kilo Pascal, we need to backwash

00:07:19.479 --> 00:07:26.440
the filter. This is as per here it is given
ASAE that is American Society of Agricultural

00:07:26.440 --> 00:07:27.440
Engineers.

00:07:27.440 --> 00:07:34.259
Now, this has changed to the American Society
of Agricultural and Biological Engineers,

00:07:34.259 --> 00:07:40.440
ASABE. Earlier, it was ASAE.

00:07:40.440 --> 00:07:48.750
So, here you are seeing that how the filter
is backwashed. So the backwashing is done.

00:07:48.750 --> 00:07:55.009
We are opening and allowing the water to go
from this end and then closing the valve here

00:07:55.009 --> 00:08:08.759
and then opening this valve. So, this particular
view is backwashing is in progress.

00:08:08.759 --> 00:08:18.700
The screen filter flushing at a schedule daily
interval is necessary to maintain screen filter.

00:08:18.700 --> 00:08:29.819
And it is recommended that screen filters
should be cleaned if the pressure drop it

00:08:29.819 --> 00:08:40.110
exceeds more than 0.5 kg per square centimeter.
So, this is another important thing that one

00:08:40.110 --> 00:08:47.070
should see these values. And then the, before
the start of drip irrigation system, flush

00:08:47.070 --> 00:08:57.089
valve on the filter lid should be kept open
so that the dirt and silt is flushed out.

00:08:57.089 --> 00:09:08.641
The filter element is taken out from the filter
and it is cleaned in flowing water, or by

00:09:08.641 --> 00:09:17.190
using the soft plastic brush when we are rubbing
on the surface of the screen it can be cleaned

00:09:17.190 --> 00:09:26.810
by using these things. And then again it should
be replaced if it has got damaged. You can

00:09:26.810 --> 00:09:35.300
see here how the cleaning of screen filter
it is taking place in case that is the screen

00:09:35.300 --> 00:09:40.089
filter it is being shown here.

00:09:40.089 --> 00:09:51.910
Then, maintenance of fertigation unit, so,
before and after fertigation, any system not

00:09:51.910 --> 00:10:02.470
only the Venturi but all other ways of fertigation
mechanism which I have explained to you that

00:10:02.470 --> 00:10:07.450
whether it is a pressurized tank whether it
is a Venturi injector whether it is an injection

00:10:07.450 --> 00:10:16.040
pump, it should be cleaned with clean water
for 10 to 15 minutes so that all the components

00:10:16.040 --> 00:10:17.350
are washed.

00:10:17.350 --> 00:10:27.630
And there is no chemicals they remain in the
fertigation unit. If it remains there it will

00:10:27.630 --> 00:10:36.800
clog the suction port of the Venturi. So,
it is important to note that the equipment

00:10:36.800 --> 00:10:45.570
is to be acid resistant. The lid of the fertilizer
tank should be fully tightened while operation.

00:10:45.570 --> 00:10:52.990
Otherwise, there will be leakage. In order
to check leaks between the body and bell housing

00:10:52.990 --> 00:11:02.290
in a fertigation pump, clean the seals seating
and put back the seal or change and keep the

00:11:02.290 --> 00:11:09.290
position of bell housing at upright.

00:11:09.290 --> 00:11:23.339
Sub-main, lateral and bi-wall flushing, so,
sometimes silt escapes through the filter

00:11:23.339 --> 00:11:33.530
and settles in the sub-main pipeline and lateral
pipeline. And this causes the growth of algae,

00:11:33.530 --> 00:11:43.709
bacteria, formation of slimes, and paste in
the pipeline. So, this is to be taken care.

00:11:43.709 --> 00:11:51.540
So, what happened? We need to flush these
systems to remove these formations in the

00:11:51.540 --> 00:11:52.540
sub-main pipeline.

00:11:52.540 --> 00:11:59.610
It should be flushed by opening the flush
valve which is provided at the end of the

00:11:59.610 --> 00:12:09.430
valve. A lateral lines should be flushed by
removing the end cap. By flushing, even the

00:12:09.430 --> 00:12:16.410
traces of accumulated salts will also be removed
when we are flushing because water is coming

00:12:16.410 --> 00:12:23.200
in pressure through with the flow all the
dirt all the salt which are deposited. And

00:12:23.200 --> 00:12:31.970
this will help in the proper functioning.
Proper operation of the emitters also.

00:12:31.970 --> 00:12:41.620
The flushing is stopped by closing the system
after some time and then one should see that

00:12:41.620 --> 00:12:49.861
the water coming out of the lateral pipeline,
sub-main pipeline, and main pipeline. When

00:12:49.861 --> 00:12:54.950
it looks clean, then it should, one should
stop the cleaning part.

00:12:54.950 --> 00:13:05.240
The other part is chemical treatment. So,
clogging or plugging of emitters, orifices

00:13:05.240 --> 00:13:11.529
bi-wall, it happens due to precipitation or
accumulation of certain dissolved salts due

00:13:11.529 --> 00:13:27.830
to carbonates, bicarbonates of iron, calcium,
manganese, and all other kinds of salts. So,

00:13:27.830 --> 00:13:37.930
clogging is also due to presence of microorganism
which I already I have told you about the

00:13:37.930 --> 00:13:39.920
requirement of filters when we were discussing.

00:13:39.920 --> 00:13:49.910
So, the presence of microorganism and the
related iron, sulfurs slimes due to algae

00:13:49.910 --> 00:13:58.339
and bacteria. So, these affect. So, clogging
or plugging is usually removed by chemical

00:13:58.339 --> 00:14:06.940
treatment. And chemical treatment in the drip
irrigation system include addition of chlorine

00:14:06.940 --> 00:14:16.910
means by using the chlorine or some acid means,
sometime the low concentration of the sodium

00:14:16.910 --> 00:14:28.140
hypochlorite, the low concentration of the
HCL, these are used. Or, this kind of a compound

00:14:28.140 --> 00:14:33.420
they are used to as a chemical treatment.

00:14:33.420 --> 00:14:39.649
The frequency of chemical treatment on the
degree of clogging and quality of water. So,

00:14:39.649 --> 00:14:47.230
as a general rule, treatment is performed
once in 10 days and chlorine treatment is

00:14:47.230 --> 00:14:54.550
done once in 15 days. But depending on the
quality of water, this can be done at further

00:14:54.550 --> 00:15:03.589
interval. Only thing that, it should be intermittent
or continuous for few minutes almost every

00:15:03.589 --> 00:15:06.490
alternate day that can also be done.

00:15:06.490 --> 00:15:15.600
Acid treatment means HCl that is hydrochloric
acid is injected into micro irrigation system

00:15:15.600 --> 00:15:26.690
at the rate suggested by water analysis report.
The acid treatment is performed till pH of

00:15:26.690 --> 00:15:35.209
water is 4. Means, this is the, another thing
that it should not go beyond 4. Otherwise,

00:15:35.209 --> 00:15:44.200
it will be harmful to the plant. It will be
harmful to the soil. And after achieving pH

00:15:44.200 --> 00:15:49.570
of 4, system is shut off for 24 hours.

00:15:49.570 --> 00:15:58.410
Then, next day, system is flushed by opening
the flush valve and lateral end cap. So, whatever

00:15:58.410 --> 00:16:06.320
dirt it is deposited in the lateral pipeline,
once it is flushed, it will take out this

00:16:06.320 --> 00:16:11.589
dirt material deposited in the pipeline.

00:16:11.589 --> 00:16:22.990
Chlorine treatment, it is in the form of bleaching
powder. And it is perform to inhibit the growth

00:16:22.990 --> 00:16:35.550
of microorganism like algae and bacteria.
Bleaching powder is dissolved in water and

00:16:35.550 --> 00:16:50.759
this solution is injected into the system
for about 30 minutes. The system is shut off

00:16:50.759 --> 00:17:01.230
for 24 hours. After that lateral end caps,
flush valves are opened to flush out the water

00:17:01.230 --> 00:17:04.949
with impurities.

00:17:04.949 --> 00:17:17.939
The recommended chlorine doses of 0.5 ppm
to 1 ppm; concentration is applied continuously

00:17:17.939 --> 00:17:32.299
at 20 ppm 20 minutes at the end of each lateral
for algae. So, this is for when we are using

00:17:32.299 --> 00:17:42.809
slimes, 1 ppm free residual chlorine is maintained
at the end of each lateral. So, this is to

00:17:42.809 --> 00:17:50.570
be observed carefully because acid treatment,
chlorine treatment, these are important and

00:17:50.570 --> 00:17:56.480
then maintenance of this system will be effective
and it should be maintained at regularly.

00:17:56.480 --> 00:18:04.330
Particularly for iron precipitation, so, it
will depend upon the type of quality of water.

00:18:04.330 --> 00:18:11.600
So, iron mainly in the lateritic soil zones,
the iron precipitation is the major problem

00:18:11.600 --> 00:18:22.820
and the 0.64 times the iron content are used
to maintain 1 ppm free residual chlorine at

00:18:22.820 --> 00:18:33.980
the end of each lateral. Efficiency of chlorine
injection is related to the pH of water that

00:18:33.980 --> 00:18:39.700
is required to be treated.

00:18:39.700 --> 00:18:49.230
When it is more acidic water, more chlorine
may be required for high pH water. So, particularly

00:18:49.230 --> 00:19:00.240
for high pH places where certain salts have
been added in that case means chlorine content

00:19:00.240 --> 00:19:09.059
or the amount of chlorine may be required
to apply in a more quantity. Rate of liquid

00:19:09.059 --> 00:19:16.710
chlorine or acid depends on the system flow
rate. So, rate of injection is estimated and

00:19:16.710 --> 00:19:22.370
that can be determined by using the equation
as stated below.

00:19:22.370 --> 00:19:32.980
So, what you are seeing here the rate of injection
of chemical into the system. It can be given

00:19:32.980 --> 00:19:42.300
by the desired concentration. The concentration
it is desired in the irrigation water. And

00:19:42.300 --> 00:19:52.360
then, what is the supply rate? Means, means
the system supply rate, means the pump discharge

00:19:52.360 --> 00:19:59.700
divided by the concentration of chemical solution
that is to be injected. This is given in percentage.

00:19:59.700 --> 00:20:07.340
So, this expression is that the rate of injection
of chemical in liter per hour can be expressed.

00:20:07.340 --> 00:20:15.340
This is a unit constant because we are using
this particular value in percent. This particular,

00:20:15.340 --> 00:20:22.370
you know supply, it is expressed in part per
million. And then the rate of flow or pump

00:20:22.370 --> 00:20:30.970
discharge, system discharge, it is the liter
per minute. So, this is, this particular expression

00:20:30.970 --> 00:20:38.200
is 6 into 10 is to power minus 3 is used to
calculate the rate of chemical injection.

00:20:38.200 --> 00:20:48.140
So, we you can refer these books for this
particular topic to go in detail. And then

00:20:48.140 --> 00:20:57.400
these books say the book by A M Michael, this
can be referred as a textbook. And then these

00:20:57.400 --> 00:21:05.870
are some other books which are very important
books that can be referred for this particular

00:21:05.870 --> 00:21:06.960
topic.

00:21:06.960 --> 00:21:14.460
So, let us summarize this particular lecture.
This lecture, we dealt with the maintenance

00:21:14.460 --> 00:21:25.330
of filtration system. We dealt with the maintenance
of water distribution network. That is your

00:21:25.330 --> 00:21:31.059
irrigation pipeline, main pipeline, sub-main
pipeline as well as lateral pipeline. Then,

00:21:31.059 --> 00:21:40.870
how to prevent the clogging of drip emitters,
we discussed, and how to chemically treat

00:21:40.870 --> 00:21:43.210
these emitters to prevent further clogging.

00:21:43.210 --> 00:21:52.549
Now, in the forthcoming lecture, we will deal
with soil water movement through a drip emitter,

00:21:52.549 --> 00:21:59.150
which we will be discussing in detail in the
coming lecture. So, thank you very much.